The slower winter season has allowed us to continue to work on the Hearse a bit more in between shop projects. Lance has put lots of time into cleaning up the engine bay, weeding through wires, removing unnecessary items , etc.  The harness Lance and Randy @ Yates EFI designed together came out amazing.  The harness is fully installed and the layout really allowed us to clean up the engine bay.

We opted to remove the LS6 intake and in its place went a Super Victor intake, 90 degree elbow by Aaron @ 6061.com , LS2 TB & ID2000 injectors. This will be worth some power, support our future motor and really adds to the cool factor of the build.  The fuel system is all complete up front and we’ll be addressing the rest of the system in upcoming weeks.

The interior has all been removed to prep for the upcoming 8 pt. roll bar and additional chassis reinforcements. We plan to have Shane and Lance working on this during our Christmas break .. THANKS GUYS!

[nggallery id=5]

It has been a long road for this project and we are all very excited to finally see the car nearing completion.

Related Posts

Search by product name, SKU or keyword